Monday, 15 September 2008

Update on installations

Heard today that the main items of work are either complete, or will be the end of today. It is possible that the solar panel will be left to a later date but that is not important as its main use is for when we are not using the boat when it will maintain the charge in the cabin services batteries.

Also, David Dare reported that the Aynho Cherwell crossing remains navigable (despite what the Waterscape site says) although they have been having considerable problems with their hire boats and the water levels further down the canal and onto the River Thames.

We can also expect someone to be available at the boatyard on Sunday when we plan to arrive for our holiday who can show us how the new equipment works.

The next few days will see us making the last few arrangements and collecting all the items together to be packed ready for a swift departure after church on Sunday. One of the last items on the list was a lower-powered hairdrier which has now been ordered this afternoon on the internet (Babyliss Eco). Also updating the boaters guides and other information to be stored on the laptop.

No comments: